Cover Build Method
A typical construction method of "rebuilding while operating"! The roof and exterior walls are installed first.
The "Cover Build Method" is one of the representative construction methods of Yoshizawa Architectural Structural Design, made possible by precise structural calculations, allowing for "reconstruction while in operation." Machines and equipment within the factory that cannot be moved are left in place, while a steel frame is assembled over the existing factory, with the roof and exterior walls installed first. After ensuring that rain and wind do not enter, the existing buildings within the new structure are gradually dismantled while the reconstruction proceeds. 【Features】 ■ Made possible by precise structural calculations ■ New buildings are constructed to cover the existing ones ■ Machines and equipment that cannot be moved within the factory are left as they are *For more details, please refer to the PDF materials or feel free to contact us.
- Company:ヨシザワ建築構造設計
- Price:Other